Design management
Whether the construction set is buildable, or whether the RFIs get resolved on site at your cost.
One party holding the consultant team to a coordinated, buildable, construction-ready set, so clashes are found on paper rather than at frame stage.
One party holding the consultant team to a coordinated, buildable, construction-ready set, so clashes are found on paper rather than at frame stage.
Step by step.
Design responsibility matrix
Who documents what, to what level, by when — agreed before documentation starts.
Consultant coordination
Architectural, structural, civil, hydraulic, electrical and fire coordinated against one programme.
Buildability review
Each package reviewed against how it will actually be built and sequenced.
Clash resolution
Services, structure and finishes reconciled before the set is issued for construction.
Documentation control
Revision control, RFI register and issued-for-construction status tracked in one place.
The output, in your hands.
- A coordinated issued-for-construction set
- An RFI register with response times
- A design responsibility matrix
- Buildability comments package by package
- Value-management options with costs attached
To start, we need this.
- The current consultant team and their scopes
- The documentation issued to date
- The planning permit conditions
Completed projects beyond those published here can be provided on request, with dwelling numbers, contract values and referees. Ask for the full list.
Tell us about the site.
Send the address, the documentation stage and the programme you are working to. We will tell you what we would need to price it, and who would run it.