Facade interfaces: where multi-residential defects actually originate
Quality · 20 August 2026

Facade interfaces: where multi-residential defects actually originate

Most post-handover water ingress claims trace back to a junction that was never detailed, sampled or tested. The controls are inexpensive; the rectification is not.

Home/Insights/Quality

Water ingress is the largest single category of post-handover defect in attached residential construction, and the majority of it originates at a small number of predictable junctions.

Detailing those junctions in shop drawings, approving a physical prototype, and water testing before lining are the three controls that prevent the rectification cost.

Worked example — a triple-storey boutique apartment building over a basement, the form of the Richmond project in our portfolio, carries most of its water risk at four junctions: the basement-to-ground slab, the balcony threshold on each level, the window head and sill in the lightweight wall, and the parapet-to-roof transition.

Each of those gets a shop drawing, a physical sample and a water test before any lining goes on. The cost of that is measured in days. The cost of finding the same junction after handover is measured in scaffold, access agreements with owners, and a rectification programme around people living in the building.

On a 100+ dwelling site such as Box Hill South the same four junctions repeat across every building, which is what makes approving one prototype worth more than detailing each one separately.

More project evidence on request.

Completed projects beyond those published here can be provided on request, with dwelling numbers, contract values and referees. Ask for the full list.

More insights

Also from the sites.

Start a conversation

Tell us about the site.

Send the address, the documentation stage and the programme you are working to. We will tell you what we would need to price it, and who would run it.

WestUrban Construction

411–415 Ferntree Gully Road
Mount Waverley VIC 3149

03 9546 7078
info@westurban.com.au

More completed projects available on request — ask for the full list.

Medium density

Townhouses & infill Multi-stage communities Social & affordable Multi-unit High-end residential

Delivery

Feasibility & ECI Design management Programme & cost Structures & basements Handover & aftercare

Evidence

Project portfolio Delivery team Systems & ESG Awards & accreditation Insights

Work with us

Get your site assessed Capability statement Prequalification pack Subcontractor registration About WestUrban